WhatsApp
Commercial kitchen design team reviewing a technical plan beside a completed open kitchen

Commercial kitchen design & build

Commercial kitchen design
begins before the equipment.

Primeo starts with the operating idea—menu, covers, service flow and people—then develops every refrigeration, equipment and fabrication decision around it.

ContinueExplore the system
Design intelligence
01Menu-led planning
02Technical coordination
03Built delivery

Design intelligence

Specify less by catalogue.
Design more by consequence.

A fryer changes extraction. A menu change alters refrigeration. A longer service line affects labour and guest experience. Primeo connects those decisions before they become expensive site problems.

01 / Spatial planning

Operational layouts

Zone planning, adjacency studies, workflow routes and equipment footprints built around real service.

02 / Technical coordination

Services resolved early

Power, water, drainage, refrigeration, extraction and access coordinated with the wider project team.

03 / Detailed specification

Everything has a reason

Equipment, glass, stainless grades and custom fabrication selected against capacity and duty.

One coordinated process

From first service diagram
to opening night.

One team protects the design intent through specification, manufacturing, installation and commissioning.

01

Discover

Define the menu, service style, covers, staffing, storage and commercial ambition.

02

Plan

Map food flow, people flow, clean and dirty routes, adjacencies and operating zones.

03

Engineer

Coordinate refrigeration loads, extraction, drainage, electrical demand and equipment clearances.

04

Specify

Select the right equipment by duty, capacity, maintainability and whole-life value.

05

Make

Fabricate counters, refrigeration and stainless infrastructure around the approved plan.

06

Deliver

Install, commission, hand over and support the kitchen through opening and operation.

Designed around operating reality

The brief changes.
The discipline does not.

Capacity, temperature, labour, replenishment and guest experience are balanced differently for every sector. The design process makes those priorities explicit.

Large hotel production kitchen during service01

Hotels & high-volume hospitality

Central production, banquet plating, multiple outlets and resilient cold storage coordinated for peak demand.

Discuss this sector
Chef-led omakase kitchen with integrated glass refrigeration02

Restaurants & chef-led dining

Compact, precise working lines that support the menu while keeping guest-facing kitchens visually composed.

Discuss this sector
Patisserie production kitchen connected to a cake display03

Bakeries, cafés & patisserie

Preparation, proofing, baking, cold holding and retail display planned as one product journey.

Discuss this sector
Premium food retail environment with integrated display refrigeration04

Food retail & convenience

High-visibility refrigeration, replenishment routes and temperature control designed around merchandising.

Discuss this sector
Precision stainless worktop, refrigerated drawer and service-panel junction

Design carried through

Stainless steel kitchen equipment, made to fit.

Custom stainless steel kitchen equipment, refrigerated interfaces, clean sightlines and chef-ready access are developed around the approved plan. SUS304 is specified where the duty and project requirements call for it.

  • Guest-facing presentation and back-of-house capacity
  • Low-iron glass visibility with stable cold performance
  • Custom stainless transitions, interfaces and service access
Discuss your kitchen

Begin with the brief

Plan the operation.
Then specify the kitchen.

Share the menu, covers, site information and programme. Our team will define the right planning route before equipment is selected.

Start a project discussion